An-Najah University Journal for Research - A (Natural Sciences)

Scopus

Scopus profile and journal metrics

This journal is indexed in Scopus. Use these metrics for a quick publishing snapshot, then open the Scopus page for the authoritative profile.

Scopus
An-Najah University Journal for Research - A (Natural Sciences) Indexed in Scopus since 2019
CiteScore 0.8
Indexed since 2019
First decision 5 Days
Submission to acceptance 160 Days
Acceptance to publication 20 Days
Acceptance rate 14%

SCImago

SCImago Journal Rank preview

Use SCImago when you want a quick visual view of the journal ranking profile and external discoverability signals.

An-Najah University Journal for Research - A (Natural Sciences) SCImago Journal & Country Rank

DOAJ

Directory of Open Access Journals listing

The DOAJ record is useful for readers, librarians, and authors who want a direct open-access directory entry for the journal.

DOAJ
An-Najah University Journal for Research - A (Natural Sciences) Open directory record
original_full_paper

Subject Review: The State of the Art in Integration of Cost and Time Models

Published
2003-03-08
Pages
99 - 122
Full text

Abstract

Cost and time are interdependent by their very nature. However, cost and time are generally treated in isolation both informally and within the terms of the contract. In reality, cost and time interact throughout the construction cycle. Thus, cost and time models and modelling systems must facilitate the integration of cost with time. Recognition must also be given to the need to integrate cost and time, and suitable contractual procedures for utilising more advanced styles of modelling must be implemented. In this paper traditional and emerging models of cost and time are reviewed and the contractual context of cost and time integration is explored. This review seeks to ascertain if and why models and contracts have failed to satisfy this particular requirement, as well as the other requirements placed upon them. Key Words: Cost Models; Time Model; Integration and Modelling System

Article history

Received
2000-09-04
Accepted
2003-03-08
Available online
2003-03-08
original_full_paper

Subject Review: The State of the Art in Integration of Cost and Time Models

Published
2003-03-08
الصفحات
99 - 122
البحث كاملا

الملخص

Cost and time are interdependent by their very nature. However, cost and time are generally treated in isolation both informally and within the terms of the contract. In reality, cost and time interact throughout the construction cycle. Thus, cost and time models and modelling systems must facilitate the integration of cost with time. Recognition must also be given to the need to integrate cost and time, and suitable contractual procedures for utilising more advanced styles of modelling must be implemented. In this paper traditional and emerging models of cost and time are reviewed and the contractual context of cost and time integration is explored. This review seeks to ascertain if and why models and contracts have failed to satisfy this particular requirement, as well as the other requirements placed upon them. Key Words: Cost Models; Time Model; Integration and Modelling System

Article history

تاريخ التسليم
2000-09-04
تاريخ القبول
2003-03-08
Available online
2003-03-08