An-Najah University Journal for Research - A (Natural Sciences)

Journal metrics

Journal metrics

Metrics and turnaround details

First decision 5 Days
Submission to acceptance 160 Days
Acceptance to publication 20 Days
Acceptance rate 14%

Scopus

Scopus profile

This journal is indexed in Scopus. Use these metrics for a quick publishing snapshot, then open the Scopus page for the authoritative profile.

Scopus
An-Najah University Journal for Research - A (Natural Sciences) Indexed in Scopus since 2019
CiteScore 0.8
Indexed since 2019

SCImago

SCImago Journal Rank preview

Use SCImago when you want a quick visual view of the journal ranking profile and external discoverability signals.

An-Najah University Journal for Research - A (Natural Sciences) SCImago Journal & Country Rank

DOAJ

Directory of Open Access Journals listing

The DOAJ record is useful for readers, librarians, and authors who want a direct open-access directory entry for the journal.

DOAJ
An-Najah University Journal for Research - A (Natural Sciences) Open directory record
original_full_paper

Resource Significant Cost and Time Models for Building Projects

Published
2003-10-14
Pages
225 - 253
Full text

Abstract

Cost and time models have been developed for road and bridge projects using resource significance analysis, which is in turn based on the 80/20 rule. The work packages in these models are designed to relate to site operations. They serve as the basis for measurement, estimating, planning, valuation and control in civil engineering projects. For defined categories of work, a standard set of work packages have been developed which consistently contribute about 90% of a project's resource costs and hours. The resource significant cost and time models for bridges and roads predict cost to an accuracy of 4% Cv and 3% Cv respectively. The resource hours for a project can be predicted to an accuracy of 6% Cv for bridges and 3% Cv for roads. The bridge model contains 26 work packages and the road model contains 22 work packages. Coarser models have also been developed for situations where the road or bridge is only part of an overall project, with only a small loss of accuracy.

Article history

Received
2001-07-03
Accepted
2003-10-14
Available online
2003-10-14
original_full_paper

نماذج لحساب الكلفة والفترة الزمنية لمشاريع البناء

Published
2003-10-14
الصفحات
225 - 253
البحث كاملا

الملخص

لقد تم اشتقاق نماذج لحساب الكلفة والفترة الزمنية لمشاريع الطرق والجسور باستخدام نظرية العناصر الاكثر أهمية والتي تعتمد على قانون 80/ 20%. إن الرزم في هذه النماذج تصف العمليات الإنشائية وقد استحدثت كأساس للقياس، وللحسابات، وللتخطيط ولمراقبة المشاريع الهندسية، لقدتم اشتقاق نماذج أساسية لهذه الرزم والتي تمثل 90% من عناصر الكلفة والوقت. إن نماذج حساب الكلفة والفترة الزمنية للجسور والطرق بإمكانها حساب الكلفة والفترة الزمنية بمقدار خطأ 4% للجسور،3% للطرق. إن الفترة الزمنية للمشروع يمكن حسابها بمقدار خطأ 6% للجسور و3% للطرق. أن نموذج الجسور يحتوي على 26 رزمة ونموذج الطرق يحتوي على 22 رزمة، كذلك تم اشتقاق نموذج عندما تكون الجسور والطرق جزء من المشروع العام مع فقدان الدقة بنسبة ضئيلة.

Article history

تاريخ التسليم
2001-07-03
تاريخ القبول
2003-10-14
Available online
2003-10-14