An-Najah University Journal for Research - A (Natural Sciences)

Scopus

Scopus profile and journal metrics

This journal is indexed in Scopus. Use these metrics for a quick publishing snapshot, then open the Scopus page for the authoritative profile.

Scopus
An-Najah University Journal for Research - A (Natural Sciences) Indexed in Scopus since 2019
CiteScore 0.8
Indexed since 2019
First decision 5 Days
Submission to acceptance 160 Days
Acceptance to publication 20 Days
Acceptance rate 14%

SCImago

SCImago Journal Rank preview

Use SCImago when you want a quick visual view of the journal ranking profile and external discoverability signals.

An-Najah University Journal for Research - A (Natural Sciences) SCImago Journal & Country Rank

DOAJ

Directory of Open Access Journals listing

The DOAJ record is useful for readers, librarians, and authors who want a direct open-access directory entry for the journal.

DOAJ
An-Najah University Journal for Research - A (Natural Sciences) Open directory record
original_full_paper

Pricing and Controlling Construction Projects Using the Significant Philosophy

Published
2002-12-17
Pages
1 - 24
Full text

Abstract

Recent research has demonstrated the feasibility of identifying, within any category of project, a small number of cost significant work packages whose value represent a consistently high proportion of the total bill value. Using the allied principle of quantity significance, it proved possible to build simple models, which could predict both the cost and the duration of a project. In the course of that work, a surprisingly linear relationship between value and quantity was noted. This paper reports the background to and consequences of that finding. Quantity-significant work packages are formed by aggregating those items within a trade for which a linear regression of value against quantity yields a correlation coefficient greater than 0.99 and an intercept insignificantly different from zero. The price of packages formed in this way can be determined simply by applying to all the items within the package the rate associated with the largest quantity, the so-called “characteristic item”. Application of the concepts of quantity-significance and characteristic items is expected to lead to simpler estimating and more effective control procedures, because there is no longer any need to allocate cost and resources to each individual item contributing to a work package. Keywords: Cost estimate, cost control, significance, cost modeling

Article history

Received
2001-03-19
Accepted
2002-12-17
Available online
2002-12-17
original_full_paper

التسعير ومراقبة التكلفة باستخدام نظرية الرزم الأكثر أهمية

Published
2002-12-17
الصفحات
1 - 24
البحث كاملا

الملخص

أثبتت الأبحاث الحديثة إمكانية تحديد عدد من الرزم الأكثر أهمية في أي مشروع والتي تمثل قيمتها نسبة ثابتة من التكلفة الكلية للمشروع. أن استخدام نظرية الكميات المميزة أثبت إمكانية عمل نماذج بسيطة تمكن من تقدير الكلفة والفترة الزمنية للمشروع، وقد لوحظ أن هناك علاقة خطية مدهشة بين التكلفة والكمية. يقدم هذا البحث خلفية أثر هذه النتائج. لقد جمعت الرزم الأكثر تميزاً من عدة مشاريع ومعامل الارتباط ما بين الكمية والتكلفة كان بنسبة تزيد على 99%، كما يمكن تحديد أسعار الرزم بضرب سعر الوحدة الأكثر كمية بالكميات الكلية للرزم. إن استخدام هذه الطريقة يمكن من حساب الكلفة ويسهل مراقبة المشروع دون الحاجة لتوزيع الموارد على كل بند من بنود الاتفاقية.

Article history

تاريخ التسليم
2001-03-19
تاريخ القبول
2002-12-17
Available online
2002-12-17